Yandi Project Design included mechanical design, control design, commissioning, and chute designs.
| Year of Construction: | 2003 |
| Location: | Yandi Ore handling – Pibara, Australia |
| Length (Tail to Head): | 5.1 km |
| Power: | 2,250 kW |
| Capacity: | 4000 tph |
| Strength: | ST-1900 N/mm |
| Speed: | 5.5 m/s |
| Material: | Iron Ore |