Aqaba Project
Aqaba Project services included mechanical redesign, full system control design, and commissioning with fully automated stacking and reclaiming equipment.
Previous
Next
Year of Construction: 2009
Location: APC – Aqaba, Aqaba, Jordan
Length : 559 m (Stacker) and 526 m (Reclaimer)
Power: 100 kW (Stacker) and 150 kW (Reclaimer)
Capacity: 500 tph (Stacker) and 2,000 tph (Reclaimer)
Strength: EP-500 N/mm
Velocity : 2.83 m/s (Stacker) and 2.75 m/s (Reclaimer)
Material: Potash