BHP Bi-Way Project
BHP Bi-Way Project – Services for this 8.5 km curved, overland system included feasibility, design audit, tunnels, and head tail drive.

Year of Construction: 1996
Location: Port Hedland, Australia
Length : 8.5 km
Power: 2,700 kW
Capacity: 4,000 tph
Strength: ST-2000 N/mm
Velocity : 6.2 m/s
Material: Iron Ore