Collahuasi Project Design included mechanical design audit, chute designs (4 chutes) joint venture with Krupp, and provided control system logic. Additional Forensic work done on site in 2009 and 2011.
| 115-CV-205 | 115-CV-203 | |
| Year of Construction: | 2003 | |
| Location: | Chile | |
| Length (Tail to Head): | 2799.6 m | 5399.8 m |
| Power: | 4 x 2050 kW | 3 x 2050 kW |
| Capacity: | 8000 tph | 8000 tph |
| Strength: | ST-6300 | ST-6300 |
| Speed: | 5.11 m/s | 6.0 m/s |
| Material: | Copper Ore | |