CDI’s scope included route optimization, chute designs, and mechanical design for the overland conveyors in Dangote Cement’s plant in Ethiopia.
C1 | C2 | |
Year of Construction: | 2015 | |
Location: | Ethiopia | |
Length (Tail to Head): | 2469 m | 1415 m |
Power: | 2940 kW | 980 kW |
Capacity: | 1293 tph | 1293 tph |
Strength: | ST-1500 | ST-1500 |
Speed: | 5.60 m/s | 5.60 m/s |
Material: | Limestone |