Fujairah Pipe Conveyor Project Design included mechanical design audit, commissioning support, detail design of maintenance trolley.
Year of Construction: | 2023 |
Location: | Dibba, UAE |
Length (Tail to Head): | 4.25 km |
Power: | 3 x 1200 kW |
Capacity: | 4400 tph |
Strength: | ST-1600 N/mm |
Speed: | 5.5 m/s |
Material: | Limestone, Gabbro, Clinker |