Eastern Range Project Design, in Eastern Range, Australia, included mechanical design, control design, and commissioning.
Year of Construction: | 2004 |
Location: | Eastern Range, Australia |
Length (Tail to Head): | 1.555 km |
Power: | 250 kW |
Capacity: | 2,200 tph |
Strength: | |
Speed: | 5.0 m/s |
Material: |