El Abra Project services for the copper ore conveyors included: downhills, tunnel, splice design, dynamic testing, forensic testing and design audit.
| CV-102 | CV-103 | CV-206 | |
| Year of Construction: | 1998 | 1998 | 2002 |
| Location: | El Abra Mine, Chile | ||
| Length (Tail to Head): | 5 km | 9.5 km | 2.2km |
| Lift: | -85 m | -512 m | 68m |
| Power: | 5 x 900 kW | 4 x 1800 kW | 6 x 900 kW |
| Capacity: | 8,620 tph | 8,620 tph | 9,500 tph |
| Strength: | ST-6800 N/mm | ST-6800 N/mm | ST-4000 N/mm |
| Speed: | 5.9 m/s | 5.9 m/s | 5.9 m/s |
| Material: | Copper Ore | ||