El Abra Project

El Abra Project services for the copper ore conveyors included: downhills, tunnel, splice design, dynamic testing, forensic testing and design audit.

CV-102CV-103CV-206
Year of Construction: 199819982002
Location: El Abra Mine, Chile
Length (Tail to Head): 5 km9.5 km2.2km
Lift: -85 m-512 m68m
Power: 5 x 900 kW4 x 1800 kW6 x 900 kW
Capacity: 8,620 tph8,620 tph9,500 tph
Strength: ST-6800 N/mmST-6800 N/mmST-4000 N/mm
Speed: 5.9 m/s5.9 m/s5.9 m/s
Material: Copper Ore
Interesting Features:
  • Large downhill conveyor