Essroc Project
Essroc Project Design included mechanical design, control design, and chute design(3). New control system with an upgraded mechanical design. Additional Forensic work done on site in 2015.


Previous
Next
Year of Construction: 2010
Location: Essroc – Allentown, PA
Length : 2.734 km
Power: 900 kW
Capacity: 1,000 tph
Strength: ST-700 N/mm
Velocity : 3.3 m/s
Material: Limestone
Interesting Features:
- By-way conveying mid-station drive.
- 400 m horizontal curve.