German Creek Project Design – Responsible for mechanical design, control logic for starting and stopping, head tail drive, and commissioning support, in association with Barclay Mowlem.
| Year of Construction: | 1995 |
| Location: | Australia |
| Length (Tail to Head): | 5.2 km |
| Power: | 4,480 kW |
| Capacity: | 2,200 tph |
| Strength: | ST-1120 N/mm |
| Speed: | 4.5 m/s |
| Material: | Coal |