Gualcamayo Project, Gualcamayo – Yamana Gold, San Juan Province, Argentina, included mechanical system evaluation and commissioning.
Year of Construction: | 2009 |
Location: | Gualcamayo – Yamana Gold, San Juan Province, Argentina |
Length (Tail to Head): | 1.626 km |
Capacity: | 1,2500 tph |
Strength: | ST-2500 N/mm |
Speed: | 3.33 m/s |
Material: | Gold Ore |