IronOre Canada Project
IronOre Canada Project services included tension control analysis and upgraded control logic.





Previous
Next
Year of Construction: 2015
Location: Labrador City, NL, Canada
Length : 6.062 km
Power: 4,800 kW
Capacity: 6,000 tph
Strength: ST-2500 N/mm
Velocity : 6.0 m/s
Material: Iron Ore
Interesting Features:
- -48ºC to 30ºC Temperature range
- Unusual tail drive control to control tension in horizontal curves