Mundra Project Design included mechanical design, component specifications, and chute design.
AD-1C | AD-2C | AD-3C | |
Year of Construction: | 2010 | ||
Location: | Mundra Port - India | ||
Length (Tail to Head): | 2.7 km | 403 m | 3.7 km |
Power: | 2 x 800 kW | 2 x 250 kW | 4 x 800 kW |
Capacity: | 6000 tph | ||
Strength: | ST-1800 N/mm | ST-630 | ST-1800 N/mm |
Speed: | 7.5 m/s | ||
Material: | Coal |