Nesher Project, in Israel, CDI audited this site with dynamic and forensic testing.
Year of Construction: | 1997 |
Location: | Israel |
Length (Tail to Head): | 2.927 km |
Power: | 1,000 kW |
Capacity: | 1,400 tph |
Strength: | ST-1000 N/mm |
Speed: | 4.26 m/s |
Material: | Limestone |