PECEM Project Design included belt design, power analysis, belt tension analysis, dynamic analysis, and chute design.
| TC-2 | TC-3 | |
| Year of Construction: | 2011 | |
| Location: | PECEM-CIPP Brasil | |
| Length (Tail to Head): | 2.8 km | 2.94 km |
| Power: | 2 x 1030 kW | 2 x 1030 kW |
| Capacity: | 2500 tph | 2500 tph |
| Strength: | ST-1600 | ST-1600 |
| Speed: | 5.0 m/s | 5.0 m/s |
| Material: | Coal | |