Phosboucraa
The system had been out of commission for a number of years and was experiencing numerous problems. CDI was contracted to audit the system and identify problems.



Previous
Next
Date of CDI Study: 1996
Location: Morocco
Length: 96 km (11 conveyors)
Power: 24,000 kW
Capacity: 1800 tph
Strength: ST-3150 N / mm
Velocity: 4.00 m/s
Material: Phosphates
Interesting Features:
- Longest chain of belt conveyor in the world.
- Motorized maintenance trolley