Pico Project Design services included mechanical design, dynamic analysis, brake system design, instrumentation, and control system design. The control system design included the logic development, programming (Allen Bradley PLC5/30), on-site commissioning, and performance testing. The control system included a supervisory system (FactoryLink) provided by others.
The project is a 4.7 Km route at 3000TPH for the transportation of iron ore consisting of one overland, three downhill, six plant conveyors and an automated trainload out system. It also included two silo / feeder systems, a shuttle conveyor (moveable head) and interfacing to the stacker / reclaimer systems.
Year of Construction: | 1994 |
Location: | Pico, MBR, Brazil |
Length (Tail to Head): | 4.73 km |
Power: | 2,800 kW |
Capacity: | 3000 tph |
Strength: | ST-1600 and ST-2000 N/mm |
Speed: | 4.6 m/s |
Material: | Iron Ore |