Pico Project

Pico Project Design services included mechanical design, dynamic analysis, brake system design, instrumentation, and control system design. The control system design included the logic development, programming (Allen Bradley PLC5/30), on-site commissioning, and performance testing. The control system included a supervisory system (FactoryLink) provided by others.

The project is a 4.7 Km route at 3000TPH for the transportation of iron ore consisting of one overland, three downhill, six plant conveyors and an automated trainload out system. It also included two silo / feeder systems, a shuttle conveyor (moveable head) and interfacing to the stacker / reclaimer systems.

Year of Construction: 1994
Location: Pico, MBR, Brazil
Length (Tail to Head): 4.73 km
Power: 2,800 kW
Capacity: 3000 tph
Strength: ST-1600 and ST-2000 N/mm
Speed: 4.6 m/s
Material: Iron Ore
Interesting Features:
  • DC drives on downhill and overland conveyors.
  • Fluid couplings on plant conveyors.
  • Fully automated train loading system.