Quintette Project Analysis and Design - The overall system was experiencing controlled braking runaways, gear reducer and pulley failures, and numerous other problems. CDI was contracted to identify, analyze, and correct the problems. The project services included pulley design, dynamic analysis, brake system design, instrumentation, and control system design. The control system design included the logic development, programming (Allen Bradley PLC2/30), on-site commissioning and performance testing. The project included a 13 Km route with 7 Km and a 6 Km downhill conveyors.
C-1 | C-2 | |
Year of Construction: | 1986 | |
Location: | Quintette Mine, Tumbler Bridge, BC, Canada | |
Length (Tail to Head): | 7074 m | 5742 m |
Power: | 2611 kW | 2611 kW |
Capacity: | 2,197 tph | 2,197 tph |
Strength: | ST-4200 | ST-3000 |
Speed: | 6.0 m/s | 6.0 m/s |
Material: | Coal |