Safford Project services included static analysis, dynamic analysis, instrumentation, and commissioning.
Year of Construction: | 2008 |
Location: | Safford, Arizona, USA |
Length (Tail to Head): | 2.17 km |
Power: | 900 kW |
Capacity: | 6,500 tph |
Strength: | ST-1200 N/mm |
Speed: | 4.1 m/s |
Material: | Copper Ore |