Tamandua Project Design services include mechanical design, dynamics analysis, brake system design, instrumentation, and control system design. The control system design included the logic development, programming (Modicon Quantum), on-site commissioning, and performance testing. The control system included a supervisory system (FactoryLink) provided by others.
The project is a 3.5 Km route at 6100 TPH for the transportation of iron ore consisting of two downhill and three plant conveyors. It also includes one silo/feeder system, a shuttle conveyor (with moveable head) and interfacing to the stacker/reclaimer systems. |
Previous
Next
Year of Construction: 2001
Location: Tamandua Mine, Brazil
Length : 3.58 km
Power: 4,500 kW
Capacity: 6,100 tph
Strength: ST-3500 N/mm
Velocity : 6.0 m/s
Material: Iron Ore
Interesting Features:
- -196 m and –125 m elevations
- Alstom variable speed/torque AC drive