Yandi Project
Yandi Project Design included mechanical design, control design, commissioning, and chute designs(2).




Previous
Next
Year of Construction: 2003
Location: Yandi Ore handling – Pibara, Australia
Length : 5.1 km
Power: 2,250 kW
Capacity: 4,000 tph
Strength: ST-1900 N/mm
Velocity : 5.5 m/s
Material: Iron Ore
Chute Design
Project scope included chute design and DEM analysis for two chutes on a system conveying iron ore, each with capacity up to 2,000 tph.
Number of Chutes: 2
Chute Design: Yes
ROCKY DEM Analysis: Yes
Capacity: 2,000 tph
Interesting Features:
- Feed chute design for Voest-Alpine.