Yaqui Project
Yaqui Project Design services included mechanical design, controls and control system design. A 3.6 Km route with three flights including one 3.0 Km overland and two smaller sections ( 500 m, 120 m ) for transporting limestone. The 3.0 Km overland and 500 m sections have downhill designs.



Previous
Next
Year of Construction: 1990
Location: Cementos Mexicanos, Yaqui Project, Mexico
Length : 3.6 km
Power: 818 kW
Capacity: 1,360 tph
Strength: ST-2450, EP-525, and EP-1400 N/mm
Velocity : 2.4 m/s
Material: Limestone