Zisco Project World Record Design – Responsible for mechanical design and control logic for starting and stopping, head tail drive, and downhills.
| Year of Construction: | 1997 | 
| Location: | Radcliff, Zimbabwe | 
| Length (Tail to Head): | 15.6 km | 
| Power: | 4 x 1250 kW | 
| Capacity: | 600 tph | 
| Strength: | ST-880 N/mm | 
| Speed: | 4.25 m/s | 
| Material: | Iron Ore |